{"product_id":"asphaltech-pothole-repair-bags-cold-asphalt-25-kg","title":"AsphalTech Pothole Repair Bags — Cold Asphalt (25 kg)","description":"\u003cp\u003e\u003cstrong\u003eFix a pothole yourself in under an hour — pour, compact, and open to traffic in 30 minutes. One 25 kg bag covers about ½ m²; most driveway potholes take 4 to 8 bags.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eOne 25 kg bag covers about ½ m²\u003c\/strong\u003e at 20 mm depth. A typical driveway pothole takes \u003cstrong\u003e4 to 8 bags\u003c\/strong\u003e — worth working out before you order, so you only pay delivery once. \u003cstrong\u003eFree collection from Alberton.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eFull description:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eAsphalTech is a \u003cstrong\u003epolymer-modified cold asphalt\u003c\/strong\u003e — a ready-to-use pothole patch straight from the bag. No heating, no torch, no special equipment. Clean out the hole, pour it in, compact it, done.\u003c\/p\u003e\n\u003cp\u003eThe best part: \u003cstrong\u003eleave it 30 minutes, then drive on it.\u003c\/strong\u003e The fast, no-fuss way to fix potholes in driveways, yards, parking areas, estate and farm roads, and worn patches of existing tar.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWhy AsphalTech lasts where cheap cold patch fails:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003ePolymer-modified for real durability — resists rutting, raveling, thermal cracking and stripping\u003c\/li\u003e\n\u003cli\u003eLonger fatigue life, so repairs stay fixed\u003c\/li\u003e\n\u003cli\u003eAlso repairs existing conventional asphalt\u003c\/li\u003e\n\u003cli\u003eApplied cold, by hand — no heavy plant or specialist crew\u003c\/li\u003e\n\u003cli\u003eMade to ISO 9001 \u0026amp; 14001 standards\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eHow much do I need?\u003c\/strong\u003e About \u003cstrong\u003e2 bags per m²\u003c\/strong\u003e at 20 mm depth, so roughly \u003cstrong\u003e½ m² per bag\u003c\/strong\u003e. Measure the hole first:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eSmall driveway pothole (about 0.3 m²) — \u003cstrong\u003e1 to 2 bags\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003eTypical driveway or gate pothole (0.5–1 m²) — \u003cstrong\u003e2 to 4 bags\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003eSeveral holes, or a worn section (2–4 m²) — \u003cstrong\u003e4 to 8 bags\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003eEstate road, farm track or car park — talk to the office about the 5 m² kit or bulk pricing\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eHow to repair a pothole:\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003eRemove loose debris and any water from in and around the hole (spade + hard brush).\u003c\/li\u003e\n\u003cli\u003eSquare off the walls with a spade and pick — stops the patch pushing out under traffic.\u003c\/li\u003e\n\u003cli\u003eIf dry, dampen the base and walls with a little water. \u003cem\u003e(For a longer-lasting bond, brush in diluted AsphalTech Bonding Primer here.)\u003c\/em\u003e\n\u003c\/li\u003e\n\u003cli\u003eFill with AsphalTech and compact well with a hand tamper, in layers no thicker than 20–25 mm.\u003c\/li\u003e\n\u003cli\u003eFill the top layer \u003cstrong\u003eslightly raised (proud) above the surrounding surface\u003c\/strong\u003e — as it compacts and traffic drives over it, it settles down level. Fill it flush and it'll sink and dish inwards.\u003c\/li\u003e\n\u003cli\u003eLeave 30 minutes, then open to traffic.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003cp\u003e\u003cem\u003eTip: don't repair in the rain. For a neater long-term fix, cut away damaged asphalt around the hole and patch the whole section.\u003c\/em\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eYou'll need (not included):\u003c\/strong\u003e hand tamper, spade, pick, hard brush, wheelbarrow, water.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eDelivery:\u003c\/strong\u003e these bags are 25 kg each, so courier costs rise sharply with distance and quantity. \u003cstrong\u003eCollection from our Alberton factory is free\u003c\/strong\u003e — worth considering if you're in or near Gauteng. For large orders outside Gauteng, contact the office for a freight quote before ordering.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eQuestions?\u003c\/strong\u003e For larger quantities, trade pricing or a formal quotation, contact the office on +27 11 868-1181 or shop@polyroads.com — or simply order online.\u003c\/p\u003e","brand":"Polyroads","offers":[{"title":"Default Title","offer_id":53686132670648,"sku":"ASPH-POT-25KG","price":161.0,"currency_code":"ZAR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0967\/0613\/4200\/files\/asphaltech-bag-single_54d4f6f1-313b-4924-9687-acf0d0204afa.jpg?v=1783951140","url":"https:\/\/shop.polyroads.com\/products\/asphaltech-pothole-repair-bags-cold-asphalt-25-kg","provider":"Polyroads","version":"1.0","type":"link"}