AsphalTech Pothole Repair 25 kg bag of polymer-modified cold asphalt

AsphalTech Pothole Repair Bags — Cold Asphalt (25 kg)

R 161.00
Sale price  R 161.00 Regular price 
Skip to product information
AsphalTech Pothole Repair 25 kg bag of polymer-modified cold asphalt

AsphalTech Pothole Repair Bags — Cold Asphalt (25 kg)

R 161.00
Sale price  R 161.00 Regular price 

Pickup available at Shop location

Usually ready in 24 hours

View store information

AsphalTech Pothole Repair Bags — Cold Asphalt (25 kg)

Shop location

Pickup available, usually ready in 24 hours

3/4 Coppel Road
Alrode South
Alberton
Gauteng
1451
South Africa

+27118681181

Fix a pothole yourself, properly: clean it out, cut it square, prime it, fill in layers and compact — open to traffic one hour after compaction. For private property: home driveways, estates and business parks.

One 25 kg bag covers about ½ m² at 20 mm depth. Measure the hole and work out the bags before you order, so you only pay delivery once.

Nationwide courier, typically 3–5 working days to main centres. Free collection from Alberton.

What it is

AsphalTech is a polymer-modified cold asphalt — a ready-to-use pothole patch straight from the bag. No heating, no torch, no special equipment. Clean out the hole, prime it, fill in layers and compact. Leave it an hour after compaction, then drive on it.

The fast, no-fuss way to fix potholes in driveways, yards, parking areas, estate and farm roads, and worn patches of existing tar.

Why AsphalTech lasts where cheap cold patch fails:

  • Polymer-modified for real durability — resists rutting, ravelling, thermal cracking and stripping
  • Longer fatigue life, so repairs stay fixed
  • Also repairs existing conventional asphalt
  • Applied cold, by hand — no heavy plant or specialist crew
How to use it
  1. Remove loose debris and any water from in and around the hole (spade + hard brush).
  2. Square off the walls with a spade and pick — stops the patch pushing out under traffic.
  3. If dry, dampen the base and walls with a little water. For a longer-lasting bond, brush in diluted AsphalTech Bonding Primer here.
  4. Fill with AsphalTech and compact well with a hand tamper, in layers no thicker than 20–25 mm.
  5. Fill the top layer slightly raised (proud) above the surrounding surface — it settles down level under traffic. Fill it flush and it'll sink and dish inwards.
  6. Leave it one hour after compaction, then open to traffic.

Tip: don't repair in the rain. For a neater long-term fix, cut away damaged asphalt around the hole and patch the whole section.

You'll need (not included): hand tamper, spade, pick, hard brush, wheelbarrow, water.

Specifications
  • Bag size: 25 kg
  • Coverage: about 2 bags per m² at 20 mm depth (roughly ½ m² per bag)
  • Compaction layers: 20–25 mm maximum
  • Time to traffic: one hour after compaction
  • Application: cold, by hand — no heating or machinery
  • Binder: polymer-modified bitumen
Shipping & returns

Delivery: courier nationwide via Bob Go, dispatched from Johannesburg within 1–2 business days. Delivery cost is calculated at checkout on your order's weight and destination — you see the price before you pay. Typical delivery is 3–5 business days to main centres.

Free collection: 3/4 Coppel Road, Alrode South, Alberton — Mon–Fri, 7am–4pm. We'll email you when your order is packed and ready.

Returns: 7-day cooling-off on unused, unopened items in original sealed packaging. Opened, mixed or part-used product can't be returned unless faulty. Faulty or incorrect items are covered for 6 months under the CPA.

Damaged in transit? Don't use it — email photos to shop@polyroads.com within 48 hours and we'll sort out a replacement or refund with the courier.

You may also like